CPV Mountain Wind
Project Quick Facts
Location: Oxford and Waldo County, ME
System Information: 20 GE 2.85 MW wind turbines, 3 GE 1.5 MW wind turbines, and 10 Gamesa G90 2 MW turbines
Total Installed Capacity: 81.5 MW
Acquired by CPV: April 2023
19,000
Homes Powered
54,530
Tons of Carbon Avoided
17,000
Cars Off the Road
Based on annual generation